bal_rd_1.jpg (19243 bytes)

Week 1

  • Inserted 2 steel floor beams into party walls.
  • Fitted the new timber floor joists from beam to beam.
  • Supported the roof slopes.
  • Removed the slates off the rear roof slope.

mini_house_home.gif (2707 bytes)